The ultimate goal of a RF site survey by VIPL is to acquire ample information to determine the number and placement of access points that allows optimal coverage throughout the facility.
The ultimate goal of LOS survey is to have MW connectivity between the two sites to ascertain the Line of Site clearance. The LOS survey is carried out physically checking the terrain between the hop and selecting the sites for acquisition. The survey is highly critical because any failure in LOS can lead to a delay in project and a subsequent loss on account.
LOS survey is carried out in the following steps:
Networks require consistent maintenance and vigilance to ensure reliable service delivery and adherence to end user Service Level Agreements (SLAs).
VIPL's systems professionals audit, experiment and test the Networks in an effervescent environment, construct empirical Network models from the collected statistical data, locate root causes and recommend possible course of action and Network modification if required.
A detailed report of the findings of the audits and analysis of the data is compiled and presented to customer's engineering team for initiating necessary corrective actions and proactive measures for future expansions.